Skip to main content

V 1.0

by Kristen Sowatsky

Introduction

Plant: Middleville

Product: 50 Gallon and 80 Gallon Models

Area: HPWH

    • Move Completed Unit onto Assembly Line (Carousel)

    • Remove Manifest and Place Magent into Tote

    • Scan Manifest / Scan New Paperwork (Label)

    • Discard old paperwork into trash

  1. Remove Label from New Paperwork, Install to upper left side of Jacket
    • Remove Label from New Paperwork, Install to upper left side of Jacket

  2. Separate and Untwist Bundled Cords.  J-Box & Compressor on Left and Control Bundle on Right
    • Separate and Untwist Bundled Cords. J-Box & Compressor on Left and Control Bundle on Right

  3. Get / Intall Label under T&P Escuteceon
    • Get / Intall Label under T&P Escuteceon

  4. Get Paperwork and Magnet from Tote and Attach to Left Side of Jacket.
    • Get Paperwork and Magnet from Tote and Attach to Left Side of Jacket.

  5. Hand Thread T&P into Spud, Secure with DC Tool Driver.
    • Hand Thread T&P into Spud, Secure with DC Tool Driver.

  6. Install T&P Foam Installation and Secure with Tape.
    • Install T&P Foam Installation and Secure with Tape.

Kristen Sowatsky

Member since: 02/26/2016

4,852 Reputation

21 Guides authored

Team

Assembly Technicians Member of Assembly Technicians

Community

4 Members

21 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 16