DNC #

ARMP09227.

Featured Document

    • Tooling: 7/A

    • Check Cert

    • Alum: 6061

    • 1.0" thk, x 4.5" +.062"/-.000" x 13.8" +.062"/-.000"

    • See sheet 6 for setup information. See sheet 9 for operation inspection report.

    • T21-Face

    • T22- Finish mill outside contour HOLD TO 13.72 +/-.001 X 4.04 +/-.001 MFG. TOL FOR HF-1

    • T24- Finish mill slots – tool check

    • T23- Finish mill small areas – Tool check

    • T25- deburr

    • T26- Drill Ø .375 clearance hole for fixture

    • T22- Mill outside to deburr

    • See sheets 7 & 8 for setup information. See sheet 10 for operation inspection report.

    • T31- Face mill to final thickness .750

    • T12- Finish mill around bosses

    • T23- Finish mill around bosses

    • T10- Finish mill pockets – Tool check

    • T27- Finish mill pockets – Tool check

    • T25- Finish mill small areas in pockets – Tool check

    • T16- Finish mill small areas in pockets – Tool check

  1. Please fill out digital form Please fill out digital form Please fill out digital form
    • Please fill out digital form

Finish Line

Attached Documents

Max Fishman

Member since: 06/20/2016

412 Reputation

2 Guides authored

Team

Assembly QA team Member of Assembly QA team

Community

5 Members

10 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 1

Past 7 Days: 1

Past 30 Days: 1

All Time: 20